top of page

LRTK app support












アプリのインストール
LRTKの位置情報を利用
Use LRTK location information
LRTK app can overwrite your smartphone with LRTK location information
現在地の保存
Save current location
The LRTK app can save LRTK's location information on the web.
① Log in to your Lconstruction account.
② Place the LRTK in the position you want to save, and put up a pin with the LRTK app. Multiple pins can be placed.
③ Save the pin you made as a file.
④ Upload the file
① Log in to your Lconstruction account


② Place LRTK in the position you want to save and put a pin on the LRTK app


(3) Save the raised pin in a file


④Upload the file


Check location information from the web
You can check the uploaded location information from the web.
①Lconstructionpage and log in.
② You can check and download files on the LRTK app page.
① Go to the Lconstruction page and log in

② You can check and download files on the LRTK app page.



位置情報をWebから確認
bottom of page