top of page
Convenient features of the LRTK app

Geotagged photos

camera.fill.png

Indoor positioning

house.png

Terrain scanning

点群アイコン候補5-2.png

Replace photo coordinate data with RTK-level accuracy

Obtain centimeter-level coordinates even indoors
Capture a target object’s point cloud with your smartphone
We also offer numerous other capabilities, including daily report generation and automatic capture of object position coordinates.
*Position-tagged photos, indoor positioning, and terrain-scanning features are available only on iPhone devices.
High-precision positioning settings
アンテナのアイコン.png

Network RTK

satellite_edited.png

CLAS​

プレゼンテーション2 - コピー_edited.jpg

Tilt compensation

スライド1_edited.jpg

L-Link

High-precision positioning settings
Operable even where there is no cellular reception
Maintains accuracy even on an incline
Configurable as both base station and rover

​Check how to use the video

LRTK Phone Image

LRTK device

Click here for LRTK devices that can be connected with the LRTK app​
bottom of page