top of page

You can try LRTK Cloud here.
Click here to watch the detailed video on LRTK’s convenience features.
Click here to watch the detailed feature introduction video.
Easy outdoor positioning
With an LRTK Phone, anyone can carry out outdoor positioning effortlessly. Simply tap the coordinate icon in the app to obtain precise location data.
Position-Tagged Photo Function
You can capture photos of on-site external installations and assets with centimeter-level positional accuracy. Both the images and their location data are easily accessible in the cloud.
Coordinate Guidance Function
Guide workers to specified points with centimeter-level accuracy, eliminating the problem of “we have inspection spots, but can’t locate them precisely on site.”
Time-Series Display of Inspection Points
Displays captured photos side-by-side for past-versus-present comparison, making it easy to diagnose deterioration.

Point-Cloud Scanning Function
You can capture point clouds with high-precision positional data and instantly perform point-to-point measurements or volume calculations directly on site.
Earthwork Volume Calculation Function
You can easily calculate earthwork volumes from 3D point-cloud data—just scan the embankment and the results are generated instantly.
View point-cloud data in LRTK Cloud
The captured point clouds can also be viewed in the cloud. As with the smartphone app, you can measure distances and display photos taken simultaneously over the point-cloud data.
2D Map-Based Position Monitoring Function
You can monitor worker positions in real time—both on a map and directly within the point-cloud data.

Function for detecting entry into restricted (no-entry) areas

The system can detect and notify you when a worker enters a restricted area. Any coordinates captured with LRTK can be designated as no-entry zones.
3D Model-Based Position Monitoring Function
You can display worker positions in real time within point clouds captured by LRTK, with vertical movement shown at even higher precision.

Function for overlaying custom drawings

You can display any custom map at the designated coordinates.
Drift-Free AR Functionality
AR visualization is possible without survey control points or physical markers. Because the system continuously tracks the device’s position and orientation, virtual objects stay perfectly aligned—no matter how far you move—so anyone can deploy high-precision AR with ease.



bottom of page