top of page

Revolutionize the worksite with a 360° field of view and high-precision positioning

LRTK 360

​CLAS-compatible

LRTK 360 image

Fusion of high-precision positioning and 360° visual information

By combining centimeter-level positioning via GNSS-RTK technology with one of the industry’s largest 360° cameras, you can record and measure the site accurately and efficiently.

Capturing 360-degree photos with LRTK 360 and an iPhone

Integration of 360° photos and point-cloud data

By overlaying point-cloud data obtained from LiDAR scans onto 360° photographs, we provide visually intuitive data. You can instantly view the site’s exact terrain and structures.

image.png

Visualize site changes with chronological display

When you upload the captured 360° photos to LRTK Cloud, the shooting positions are organized on a map and the site photos are displayed chronologically. Because data captured at the same location can be compared easily, it is ideal for progress management and fixed-point observation.

Example of listing captured images with the chronological display feature to check changes

All you need is your smartphone

It has a built-in battery and comes with an antenna. Once you have correction data ready, you can start positioning immediately just by installing the dedicated app.

App Store download logo

Details of LRTK 360

LRTK 360 details
bottom of page