top of page
Exclusive content for the LRTK app

This article takes an average of 2 minutes and 30 seconds to read
Posted April 4, 2023
① Single point positioning
It is a function to locate a single point.
The LRTK app allows you to subtract the length of your tripod or red/white pole as an offset.
data can be checked from the LRTK app or on the synchronized LRTK cloud.
Example: LRTK Cloud

You can check all the information for positioning, such as latitude, longitude and height.