top of page

Article list
~Civil-Engineering Series~
1. What Is RTK? High-Precision Basics for Civil Surveyors
2. Benefits of RTK in Civil Works and On-Site Efficiency Gains
4. Getting the Most from High-Precision LRTK GPS in the Field
6. The Future of Civil Surveys with RTK: How High-Precision GPS Changes the Field
7. RTK 101 for New Surveyors: Essential Knowledge
8. Avoiding Mistakes in RTK Surveys: On-Site Cautions
9. RTK vs Traditional Surveys: A Precision Revolution
10. How RTK Works: Why High Accuracy Is Possible in Civil Surveys
11. Surveyor’s Guide to RTK: Streamlining Civil-Site Measurements
12. Improving Construction Quality with RTK: Precision Measurement Guide
13. GPS vs RTK: Raising Accuracy on Civil Job Sites
15. RTK in Remote Areas: Challenges and LRTK Solutions
~Construction Series~
1. Mini-RTK Spurs a Surveying Revolution: iPhone-Based High-Precision GNSS
2. iPhone RTK Changing the Job Site: Compact, Lightweight, Fast Fixes
3. Point-Cloud Scans on iPhone: Latest RTK Tech for Construction
4. AR + RTK Fusion: Next-Gen Surveying with a Smartphone
5. Location-Tagged Photos Transform Site Records: iPhone RTK Tips
6. Coordinate Guidance Boosts Productivity: Small RTK Drives Construction DX
7. Must-See for Contractors! High-Precision Surveys with LRTK Phone + iPhone
8. Smartphone Surveying for Rail Projects: RTK for Safer, Faster Work
9. Turning a Phone into a Survey Instrument: Construction-Site DX with LRTK Phone
10. Palm-Sized High-Accuracy: iPhone RTK for Civil & Construction Professionals
11. Instant Point-Cloud Sharing: Smart Project Management with LRTK Phone
12. AR Surveys for Site Visibility: New Tech with iPhone + RTK
13. One RTK per Person: Redefining Field Surveys with iPhone + LRTK
14. 3-D Survey Revolution on iPhone: From Scanning to Layout in One Device
15. Productivity Gains in Construction: Advantages & Use Cases of Smartphone RTK
~Survey-Technology Series~
1. RTK Survey Revolution: Compact LRTK GPS Transforms Construction
2. Small, Light, Accurate: Fast Fix & Multi-Function RTK GPS
3. All-in-One: Point Clouds & AR on a Compact RTK Survey GPS
4. Contractor’s Choice: Fast Fix & Geo-Tagged Photos with LRTK GPS
5. Ideal for Civil Surveys: High-Precision + AR on a Mini RTK Receiver
6. Instant Fix On-Site: One Device for Point Clouds, Photos, and Guidance
7. Rail-Survey Innovation: High-Precision Layout & AR Guidance with a Mini RTK Receiver
8. Cutting-Edge LRTK: High-Precision RTK & Point-Cloud Scans via iPhone + Mini GPS
9. High-Precision RTK on a Smartphone: Benefits of Portable GPS Receivers
10. Accelerate Construction DX: RTK-Enabled Phone Transforms Positioning & Record-Keeping
11. Centimeter-Level Accuracy: Choosing a Compact GNSS for Construction RTK
12. Don’t Miss Out! Lightweight, Fast-Fix RTK GPS for Surveys
13. Survey Revolution: Point Clouds & Guidance All on an RTK-Ready LRTK Phone
14. SMEs Take Note: Low-Cost, High-Accuracy Surveys with LRTK RTK Devices
15. Future Survey Style: RTK × AR Turns Smartphones into High-Precision GPS Tools
~AR section~
1. AR-Driven Construction Management Revolution: Real-Time Progress Visualization on Civil-Engineering Sites
3. Surveying Revolution with AR: Overlaying 3-D Design Models via High-Precision RTK
2. AR-Driven Construction Management: Dramatically Reducing Errors and Boosting Efficiency
4. AR × RTK for Faster Surveys: Projecting Design Data On-Site
5. Streamlining Civil-Works Oversight with AR × RTK: Higher Accuracy & Transparent Sharing
6. Using AR to Align Stakeholders and Speed Approvals on Civil-Engineering Sites
8. The Future Opened by High-Precision RTK + AR: A New Era of “AR Civil Engineering”
7. Displaying Drawings in the Field with AR: Bridging the Client–Contractor Gap
9. RTK Makes AR This Accurate—A New Norm for the Job Site
10. Absolute-Coordinate AR: RTK-Powered Breakthroughs in Civil Construction
~Point-Cloud Series~
1. What Is Point-Cloud Data? A Civil-Engineer’s Primer
2. Beginner’s Guide to Point-Cloud Utilization: Starting 3-D Workflows in the Field
3. New Standards for As-Built Control with Point Clouds: Keys to Efficiency
4. How Point-Clouds Transform Civil Design: 3-D Model Benefits and Case Studies
5. Bridge & Tunnel Inspection with Point Clouds: Raising Productivity
7. Transforming Construction with Point-Cloud + RTK + CIM Integration
8. Fusing Point Clouds, AR, and RTK: New Tech for 3-D Visualization of Reality
9. Point Clouds as the Core of Civil-Engineering DX: Trends & Outlook
10. Real-Time Point-Cloud Use On-Site: Tablet-Based 3-D Status Checks
11. Why Absolute-Coordinate Point Clouds Matter: Changing Design and QA/QC
12. From Point-Cloud to Drawing: How 3-D Data Reshapes Design Workflows
13. Terrain Surveys with Point Clouds: Comparing Total Stations and 3-D Scans
15. Faster Earth-Volume Calculations with Point Clouds: Quick, Accurate Quantities
~Pile-Driving Series~
1. RTK Pile-Setting Guide: Pinpoint Coordinates via Smartphone Surveying
2. Pile-Coordinate Surveying Basics and Accuracy Tips
3. Boosting Pile-Driving Efficiency with Smartphone RTK: Beginner’s LRTK Guide
4. Demystifying High-Precision LRTK Pile Guidance for New Users
5. Current Challenges in Pile-Driving Operations
~JGD2024 Series~
1. What Changes with Japan Geodetic Datum 2024 (JGD2024)? Impact and Countermeasures for Construction & Surveying
3. What Is Elevation? Explaining Height Standards in the Japanese Geodetic System
~RTK Series~
1. What Is RTK? Fundamentals of Real-Time Kinematic Positioning
2. GNSS vs GPS—What’s the Difference and Why Do You Need RTK?
3. How RTK Works: Achieving High Precision with Base and Rover Stations
4. Single-Point vs Relative Positioning: Why RTK Delivers Better Accuracy
5. What Does “Centimeter-Level Accuracy” Mean? Capabilities Enabled by RTK
6. Real-Time Corrections: RTK vs Network RTK (VRS)
8. Boosting RTK Accuracy with Multi-GNSS: Beyond Stand-Alone GPS
9. The History of RTK: Evolution and Current State of High-Precision Positioning
10. Essential RTK Glossary (FAQ)
11. How to Use Network RTK (Correction Services): Steps and Precautions
16. RTK + IMU Fusion: Positioning Even When GNSS Is Interrupted
18. Getting Started with Open-Source RTKLIB: Compute RTK on Your PC
19. PPK Basics: When to Choose Post-Processed Kinematic over RTK
20. Too Few Satellites? RTK Limits and Strategies to Improve Fix Rates
21. Civil Surveying Revolution: Case Studies Shifting from Total Stations to RTK
22. RTK on Construction Sites: Machine Guidance and As-Built Management
23. Small Contractors Can Do It Too! In-House Construction Surveying with RTK
24. RTK in Railway Projects: Higher Accuracy for Track Laying and Maintenance
25. Drone Surveying + RTK: From Aerial Imaging to 3-D Mapping
26. Smart Farming Machinery: Precision Agriculture with RTK Auto-Steering
27. RTK for Building Exteriors: Rapid On-Site Layout
28. RTK in River and Erosion-Control Works: Powerful Tool for Disaster Recovery
29. Urban Infrastructure Inspection with RTK: Applications in Sewer and Road Maintenance
30. Student Projects with RTK: Academia-Industry Collaboration for Efficient Bridge Inspection
32. LRTK vs Competitors—Comprehensive Comparison for Compact, Lightweight Needs
34. Upgrading Handheld GNSS for High Precision: Adding RTK Capability
35. UAV Surveying: PPK or RTK? Selecting the Best Method for Site Conditions
37. GNSS Survey Apps Compared: Recommended RTK-Enabled Smartphone Apps
38. Traditional Methods vs Modern RTK: A Total-Station Comparison
39. How Accurate Is RTK? Experimental Verification Report
40. Using RTK in Cold or Inclement Weather: Environmental Resilience Overview
41. RTK for Beginners: Basic Setup and Measurement Guide
42. RTK Surveying Procedures Explained(Control-Point Survey Edition)
43. Easy Bluetooth Pairing: Linking an LRTK Device with the Smartphone App
44. Ten Tips for Achieving RTK Accuracy—Satellite Geometry, Multipath Mitigation, and More
45. Base-Station Setup Manual: Placement Strategies to Maximize Coverage
46. Rover Portability: Transporting and Setting Up Survey Gear On-Site
47. RTK Localization Explained: Using Known Points and National Control Coordinates
48. Leveraging LRTK 360: Embedding High-Precision Positions in Photos
50. Sharing Field-Survey Data in the Cloud: LRTK Cloud Usage Guide
51. Centimeter-Level on a Smartphone? Cutting-Edge RTK on Consumer Handsets
52. RTK in the 5G Era: Ultra-Low-Latency Communications for High-Precision Positioning
53. Satellite Positioning × AR: The Future of AR Construction Management with RTK
54. Cloud GNSS Processing & RTK: Computing Corrections over the Network
55. Toward 100+ Satellites: Ultra-High-Precision with Full Multi-GNSS
56. Indoor Positioning with RTK: Solutions for Tunnels and Underground Spaces
58. Regulations for Satellite Positioning & RTK: Trends in Drone-Survey Policy
59. RTK vs LiDAR Roles Clarified: RTK for Position, LiDAR for Shape
60. RTK Market Outlook—Next 10 Years: Growth Areas and Technical Challenges
62. RTK in the Field: Benefits and Challenges from a Surveyor’s Perspective
61. Boosting Site Efficiency with LRTK: Real-World Results
63. RTK + Autonomous Machinery: Streamlining Road Work through ICT Construction
64. Lessons from Europe’s RTK Revolution: Cutting-Edge Use Cases
65. Technology Behind LRTK Mini RTK Receivers
66. New Business Models Unlocked by RTK: Service Innovation through High-Precision Positioning
67. Municipal RTK DX: Advancing Accuracy in Public Works
68. Student-Led Regional Revitalization with RTK: New Possibilities for High-Precision Positioning
69. How RTK Transforms Site-Supervisor Workflows: Practical Construction DX
70. Effectiveness Study: Measuring Productivity and Accuracy Gains from RTK Adoption
- No. 1. 点群データとは?土木・建設現場で注目される理由とLRTKによる簡単取得法
- No. 2. 点群スキャンで施工管理が変わる!測量・出来形・土量計算の新常識
- No. 3. なぜ今"点群DX"なのか?現場に3D活用が求められる理由とは
- No. 4. スマホで点群取得?LRTKで始める現場の3Dデジタル化
- No. 5. 点群とは?建設業で注目される3Dスキャン技術をやさしく解説
- No. 6. 初心者向け!点群データの取得方法と活用事例まとめ
- No. 7. スマホで点群取得?LRTKで始める誰でもできる3D測量
- No. 8. 点群とは何か?社内説明用に使える基本と導入メリットまとめ
- No. 9. 点群×測量の現場革命|スピード・精度・省人化を同時に実現する方法
- No. 10. 中小建設業のための点群活用|安く・早く・正確に始める方法
- No. 11. 点群データの教育活用|新人研修や技術継承にも使える3D教材とは
- No. 12. なぜ今“点群DX”が求められるのか?現場改革の鍵を握る技術とは
- No. 13. 点群導入は高くない!中小企業でもできる“スマホ測量”のはじめ方
- No. 14. 点群とは?現場で役立つ“3Dデータ”の正体と利点を解説
- No. 15. 施工後に後悔しないための点群活用術|出来形記録を3Dで残す方法
- No. 16. 出来形を確実に残すなら点群!現場でのトラブル防止に効く3D管理法
- No. 17. 点群導入に迷ったら|費用・操作・効果を比べてわかる最適解
- No. 18. スマホ測量でここまでできる!図面も写真も超える“次の管理法”とは
- No. 19. 点群測量の進化:従来機器とスマホLRTKとの比較とメリット
- No. 20. スマホ×点群=現場の最適解?低コストで始める3D測量のすすめ
- No. 21. 点群をもっと身近に!土木現場が変わるLRTK技術の力
- No. 22. 点群はスマホで測る時代へ|最小コストで始める施工DX入門
- No. 23. 土木現場が変わる!点群×スマホLRTKで実現する業務効率革命
- No. 24. “測れない”をなくすスマホ測量|点群で変わる現場の見える化管理術
- No. 25. 点群測量は「難しい」「高い」はもう古い|スマホから始める現場DX
- No. 26. 点群データの現場活用が変わる!スマホLRTKで誰でもできる測量革命
- No. 27. 点群が現場の日常に!スマホLRTKで広がる“測る・見る・伝える”技術
- No. 28. 点群って難しいと思ってない?スマホではじめる3D測量入門
- No. 29. スマホで始める点群入門|測量の敷居を下げる新しい選択肢とは?
- No. 30. 点群をもっと身近に!施工・管理・共有が変わる次世代の現場術
- No. 31. はじめての点群測量|スマホとアプリだけで“測れる現場”のつくり方
- No. 32. 点群は現場の新常識!導入コストもスキルも、もう怖くない
- No. 33. はじめての点群測量|現場で使える・続けられる運用のコツ
- No. 34. 点群の始めどきは『今』!技術もコストもここまで来た
- No. 35. スマホと点群で変わる現場記録|“続く”活用の仕組みをつくるには?
- No. 36. 点群がここまで簡単に!導入で迷う理由がなくなる新常識
- No. 37. 「点群導入が不安な人こそ読んでほしい!ゼロから始める現場DX」
- No. 38. 点群を記録で終わらせない|現場で“使い続ける”ための活用設計とは?
- No. 39. 点群って結局何ができる?初心者でもわかる現場活用の基本と例
- No. 40. 点群は小さく始めて大きな効果!初心者向け導入戦略まとめ
- No. 41. 点群を“試して”分かった!小さな現場でも大きな効果が出る理由
- No. 42. 点群を使うと現場はどう変わる?初心者向け3大メリットと実例集
- No. 43. 点群でできること全部まとめました|初心者が現場で使える実例付き解説
- No. 44. 点群って難しそう…でも“試した現場”はこう変わった!
- No. 45. 点群の“難しそう”はもう過去!現場が語る導入の価値
- No. 46. 点群で何ができるかひと目でわかる!現場向け活用マニュアル入門編
- No. 47.
- No. 48.
- No. 49. 点群って実はカンタンだった!現場が教えてくれた真の価値
- No. 50. 点群で始める現場DX:導入の流れと活用メリットを徹底解説
- No. 51. 点群って結局なにができる?現場で使える導入・活用マニュアル
- No. 52. 点群って結局どう使う?現場DXに効く導入・活用の基本講座
- No. 53. 点群の導入を迷っている方へ|現場で役立てるための基本と進め方
- No. 54. 点群は誰でも使える時代に!現場が証明するカンタンな成果
- No. 55. 点群って、どう始めるのが正解?現場目線でわかる導入の流れと効果
- No. 56. 現場で点群デビュー!初心者向け導入ステップと活用例
- No. 57. 点群とは?土木現場での使い方までやさしくわかる入門ガイド
- No. 58. 点群とは?図面や写真とどう違うか土木の現場目線で解説します
- No. 59. 点群って結局なにができる?図面や写真と比較してわかる入門講座
- No. 60. 点群って何ができる?図面・写真との違いを土木目線で徹底解説
- No. 61. 点群はどうすごい?2D図面や写真と徹底比較した土木入門ガイド
- No. 62. 点群を使えばここまで見える!2Dと3Dの“できること”徹底比較
- No. 63. i-Constructionで注目の点群とは?図面・写真との違いと活用法を整理
- No. 64. 点群で始める現場DX|i-Constructionが変える土木管理の新常識
- No. 65. 点群から始める現場DX|i-Construction対応を無理なく実現する方法
- No. 66. 点群で始める現場DX|i-Constructionが変える土木管理の新常識
- No. 67. 点群で現場が見える・測れる・動き出す|施工管理の新スタンダード
- No. 68. 点群データとは?図面・写真との違いと施工管理での活用方法
- No. 69. 点群で始める現場DX|3D測量とi-Construction完全ガイド
- No. 70. 建設業のi-Constructionとは?点群による業務効率化の実例集
- No. 71. 点群×ICTで施工管理はどう変わる?現場DX最新動向を解説
- No. 72. 図面じゃ見えない現場が“見える化”!点群が起こす施工革命
- No. 73. 点群を使った出来形管理の方法とメリットを徹底解説!
- No. 74. “紙と写真”にさようなら|点群で施工管理はここまで変わる!
- No. 75. 測る・見る・記録するが1回 で完了?点群のすごさを解説!
- No. 76. 点群データが現場を動かす|建設DXのカギはここにある
- No. 77. 点群導入で失敗しないための5ステップ|建設現場DXの道しるべ
- No. 78. 今さら聞けない点群データ|土木現場のための基礎知識
- No. 79. 点群活用で工数60%削減?中小建設会社の実践事例まとめ
- No. 80. ゼロからわかる点群活用|施工管理・進捗・出来形の改善法
- No. 81. i-Construction 2.0とは何か?点群が拓く次世代施工管理
- No. 82. レーザースキャナー不要?スマホでできる点群計測の現場力
- No. 83. 国交省が推す点群活用|建設業のDXがここから始まる
- No. 84. はじめての点群活用|これだけ知れば大丈夫な超入門
- No. 85. 建設DXの本命は点群だった|2025年までに備える変化
- No. 86. 写真や図面とどう違う?点群データをやさしく解説
- No. 87. 点群ってどこまで正確?精度・限界・現場での実力を検証
- No. 88. 図面よりラクで正確?点群で学ぶ現場のデジタル測量入門
- No. 89. 施工現場での点群活用は本当に効果的?事例から見る導入効果
- No. 90. なぜ今、点群が注目されているのか?i-Constructionとの関係性
- No. 91. 点群データの保存方法は?クラウド管理とファイル形式の基本
- No. 92. 点群と写真測量、どっちを選ぶべき?費用・精度を比較!
- No. 93. 点群データ管理の教科書|ファイル形式からクラウドまで一気に解説
- No. 94. 点群データの扱い方まるわかり|取得→変換→保存→活用までの流れ
- No. 95. はじめての点群管理|ファイル形式とクラウド運用の基礎知識
- No. 96. 点群データ、どう保存してる?業務効率を上げる管理の基本
- No. 97. 点群保存、これで失敗しない!現場が選ぶ形式とクラウド管理術
- No. 98. 建設現場のDXは保存から|点群データの賢い保管と共有方法
- No. 99. 点群ファイルの『重さ』に困ったら|圧縮・分割・クラウドの活用術
- No. 100. 失敗しない点群保存|現場で使えるファイル形式と管理方法の実践ガイド
- No. 1. 測量革命:LRTKがもたらす土木現場のDX最前線
- No. 2. 高精度測量の新時代!GPS・点群・ARで現場が変わる
- No. 3. 初心者向けに「測量とは何か?初心者にもわかる基礎知識と最新技術」
- No. 4. 初心者向けに測量とは|種類・目的・必要性をわかりやすく解説
- No. 5. 初めての測量入門|測量とは?何をどう測るの?
- No. 6. 測量 とは?土木・建設現場での役割と重要性
- No. 7. 測量とは?図面と現場をつなぐ“見えない仕事”の真実
- No. 8. 測量とは?現場で使われる道具と基本用語まとめ
- No. 9. 測量とは何をする仕事?現場でのリアルな流れを解説
- No. 10. 測量とは?昔と今でこんなに違う!デジタル測量の進化
- No. 11. 測量とはどんな職業?仕事内容と必要なスキルを紹介
- No. 12. 測量とはどんな学問?建設業と切り離せない技術の全貌
bottom of page