Enhance Pile Driving Efficiency with Smartphone Surveying!

Beginner's Guide to Utilizing LRTK

タイマーアイコン.jpeg
This article takes an average of 2 minutes and 30 seconds to read
Published February 28, 2025
DSC03177.jpg

Pile driving operations on construction sites are a critical process that determines the accuracy and quality of a construction project. However, traditional methods of positioning (surveying and marking pile locations) were time-consuming and difficult for beginners. In response to this, the smartphone surveying solution "LRTK," which combines the latest RTK technology, has emerged, offering a new construction style where even beginners can easily navigate to pile positions.

This article provides a clear explanation of the challenges faced in pile driving guidance, traditional methods, the evolution of smartphone surveying, the features of LRTK, and the practical usage and benefits of its implementation.

Challenges in Pile Driving Guidance and Traditional Methods

When driving piles to mark the position of columns or structures on a construction site, the process of accurately surveying and marking the pile locations, known as "pile driving guidance," is essential. Traditionally, the surveying of pile locations involved using tools like measuring tapes, transits, and auto levels, with multiple people performing the work manually. For example, the distance from a reference point on a drawing would be measured, marks would be made on the ground, and wooden or metal stakes would be driven into the marked positions. However, this manual approach had several challenges.

In traditional surveying, equipment such as tripod-mounted levels and transits were used, and pile positioning was done manually. The process was complicated, prone to measurement errors, time-consuming, and susceptible to human errors.

Additionally, specialized knowledge and experience in surveying were required, meaning that reliance on skilled workers was unavoidable. If piles were not driven in the correct position, it could lead to misalignment of the structure, causing rework, project delays, and increased costs in later stages. Even slight positioning errors can impact the overall safety of the building, making high-precision pile driving guidance an extremely important challenge.

In response to this, the development of equipment to improve work efficiency has been progressing. For example, Topcon's "Pile Navi," a layout navigator, is used on many construction sites as a device that allows a single person to easily set up, survey, and mark pile locations. While using specialized equipment can reduce labor, the high initial cost and the time required to become proficient in its operation posed challenges for smaller sites and beginners. The question arose, "Is there a simpler way for anyone to accurately guide pile positioning?" This is where smartphone-based pile driving guidance came into play.
 

The Evolution of Smartphone Surveying and the Features of LRTK

In recent years, with the advancement of smartphone technology, it has become possible to perform surveying with just a smartphone, without the need for specialized surveying equipment. The key to this is a positioning technology called RTK. RTK (Real-Time Kinematic) corrects errors in satellite positioning systems like GPS, enabling real-time positioning with centimeter-level accuracy. Traditionally, specialized equipment such as antennas, high-performance GNSS receivers, and radio devices were required, but recently, compact devices that integrate all of these components have emerged. LRTK is one such device, an all-in-one RTK positioning device that can be attached to a smartphone.

With LRTK, your smartphone transforms into a high-precision GNSS surveying device. It displays the pile driving coordinate data from the design drawings on the smartphone screen, allowing you to check the real-time deviation from your current location. For example, it might show "0.05m east and 0.10m north to the target location," enabling precise alignment with digital guidance. Unlike traditional methods where you measure distances with a tape measure or repeatedly move between piles, the smartphone provides navigation to the pile location. This eliminates the need for manual calculations and constant reference to drawings, significantly reducing surveying errors.

Additionally, LRTK stands out by utilizing AR (Augmented Reality) technology through its smartphone app. Virtual arrows and markers are displayed through the smartphone’s camera, visually guiding you to the correct pile position. The combination of high-precision GNSS positioning and AR allows for intuitive navigation by overlaying the pile locations onto the real-world scenery.
 

With this, even beginners without specialized surveying knowledge can easily reach the correct location by simply following the on-screen instructions. In fact, the clear visual guidance provided by AR helps workers with spatial awareness and is said to reduce rework caused by mistakes.

Additionally, smartphone surveying with LRTK offers a cost advantage. By utilizing smartphones, which most people already own, there is no need to purchase expensive specialized surveying equipment, helping to reduce initial investment. The device is also palm-sized, with a built-in battery and antenna, designed to be durable and easy to handle on-site. In other words, the simplicity of "all you need is a smartphone" enables anyone to perform centimeter-level surveying, comparable to traditional equipment, which is the strength of LRTK.

Practical Smart Construction Using Pile Positioning Coordinates

Now, let's take a look at the process of using LRTK for smartphone surveying to guide pile driving. First, prepare the pile driving coordinate data (latitude, longitude, or planar coordinates of where the piles should be placed) based on the construction plan. These coordinates are imported into the LRTK smartphone app or cloud beforehand. On-site, the LRTK device is attached to the smartphone, the app is launched, and the pile point to be guided to is selected.
 

The smartphone screen displays the direction and distance to the selected pile point, and the worker moves according to the guidance. For example, in the image above, the blue arrow indicates that the target pile position is 6.34 meters away. As the distance decreases and the worker approaches the target, the display gradually shows 0 meters, indicating that the target point has been reached. The worker then drives the pile at the designated location. This allows the pile to be placed at the exact position according to the design.

Thanks to the AR navigation feature of the LRTK app, workers receive guidance similar to a car navigation system, such as "○○ meters to the pile" and "Proceed in this direction," eliminating the need to rely on maps or drawings and guesswork.

This feature, which can position both the current location and the target location with centimeter-level accuracy, ensures that even beginners can easily locate the pile position. In fact, there have been reports of LRTK being used on-site, where workers were able to easily find repair locations based on photos saved with location data in the cloud.

In pile driving operations, as long as the coordinates are shared, anyone can place the pile at the same point, preventing tasks from becoming dependent on individual workers and improving overall team productivity. Additionally, this smartphone surveying workflow helps reduce training costs. Traditionally, teaching surveying methods to new workers took time, but with LRTK’s screen guidance, training is faster, and even inexperienced workers can quickly become productive in pile driving tasks. Even if there is a lack of experienced technicians on-site, the guidance on the smartphone ensures that work can be carried out without mistakes, providing greater flexibility in staffing.

Detailed Features and Installation Method of LRTK

LRTK is a smart construction platform consisting of hardware devices, smartphone apps, and cloud services. The hardware, the LRTK device, is attached to the top of a smartphone (compatible with both Android and iPhone). This device integrates a high-precision GNSS antenna, receiver, battery, and communication module, and is designed to withstand rough handling on-site. All you need is a smartphone; no dedicated controller or additional equipment is required. The operation is simple: just attach the device to the smartphone, turn it on, and connect it to the app. RTK positioning will start immediately, and you will obtain centimeter-level positioning data on-site.

The installation process involves setting up the LRTK device and app. The device communicates with the smartphone via Bluetooth or Wi-Fi, using correction data (from network-based RTK, such as internet-provided data or the CLAS signal from Japan’s "Michibiki" satellites) to enhance positioning accuracy. Once the reference coordinate system is set in the app and pile positioning coordinate data is imported from construction drawings, the setup is complete. After that, simply walk around the site with the smartphone, following the app's guidance to locate the pile positions.

One convenient feature of LRTK is the ability to attach photos or notes to the positioned points and store them in the cloud for sharing. By saving the location of each pile with photos in the cloud database during construction, managers in the office can monitor progress in real time, and it becomes easy to review "where the piles were driven" later. The pile driving data in the cloud can be shared across the team, making handovers and reporting smoother. Additionally, once coordinates are saved, they can be reused for future expansion work or inspection tasks. For example, if you want to drive an additional pile at exactly the same location as a previously driven pile, you can call up the past data in the app and navigate to the same location with zero error. This is an effective use of data that was difficult with traditional paper records.

Moreover, the LRTK device features an inclination correction function, allowing accurate coordinates to be obtained even when the survey pole is tilted. This ensures accuracy even in situations where it’s difficult to keep the pole straight due to obstacles, making it suitable for pile driving surveys in narrow spaces or on terrain with elevation changes. As demonstrated, LRTK offers a variety of features, but its installation and setup are simple, designed for easy use in field operations. Even if you're using it for the first time, comprehensive support information and manuals (including guides within the app) are available, providing peace of mind.

Benefits and Future Prospects of LRTK Introduction

Let’s summarize the benefits gained from implementing the LRTK smartphone surveying pile driving guidance system. First, in terms of cost reduction, it helps reduce the frequency of hiring dedicated surveying technicians or external surveying contractors, which leads to lower labor and outsourcing costs. Additionally, the initial setup cost is also lower compared to purchasing expensive surveying equipment. Next, regarding work efficiency, a single worker can set up many pile points in a short amount of time. Real-time guidance reduces the need for redoing surveying or layout tasks, leading to shorter project timelines. This effect is particularly noticeable on large-scale sites where the number of survey points can reach several hundred. Since even non-experts can ensure accuracy, workforce flexibility is increased, improving the overall operational efficiency of the team.

Improvement in safety is also an important benefit. By making pile driving surveying more efficient, the amount of time workers spend in hazardous areas is reduced. The risk of surveying for long periods in heavy machinery operation zones or areas with vehicle traffic decreases, and it also contributes to reducing the strain on workers in high-risk summer heat or on sites with poor footing. Furthermore, eliminating errors in pile positioning helps prevent accidents and issues caused by construction defects. The digital accuracy provides a sense of reassurance for workers, alleviating the uncertainty of "Is this the right spot?"—a significant advantage for on-site workers.

Looking ahead, pile driving guidance technology is expected to continue its trend toward increased digitization and smart functionality. Smartphone surveying devices like LRTK are expected to become even smaller and more powerful. In the future, they may even integrate with smart glasses (AR glasses), allowing workers to check pile positions hands-free. Currently, the development of helmet-integrated products in the LRTK series is progressing, making it increasingly feasible for workers to receive high-precision positioning information without even being aware of it. Furthermore, the integration of navigation functions into construction machinery is becoming a trend. In the future, heavy equipment operators may be able to verify pile positions on their smartphone screens while excavating or placing piles, and automatic pile point marking via drones may also become a reality. LRTK will continue to increase its presence as the foundational positioning information platform.

In conclusion, this article has introduced the challenges and solutions of pile driving guidance using LRTK smartphone surveying, along with the benefits of implementation. Improving the accuracy and efficiency of pile driving tasks is an area of construction digital transformation (DX) that benefits everyone, from beginners to veterans. With LRTK, which can be started using an easy-to-use smartphone app and a compact GNSS device, both productivity and safety management on-site can be improved simultaneously. If you're interested, please check out the LRTK product page for more detailed information. Experience the cutting-edge smartphone surveying technology and explore the new standard of pile driving guidance on your site.

Significantly Improve Surveying Accuracy and Work Efficiency on Site with LRTK


The LRTK series enables high-precision GNSS positioning in the fields of construction, civil engineering, and surveying, allowing for reduced work time and a significant increase in productivity. It is also compatible with the Ministry of Land, Infrastructure, Transport and Tourism's i-Construction initiative, making it an ideal solution to accelerate the digitalization of the construction industry.

For more details about LRTK, please visit the links below:

 

  • What is LRTK? | LRTK Official Website

  • LRTK Series | Device List Page

  • Case Studies | Examples of On-Site Applications

 

For product inquiries, quotes, or consultations regarding implementation, please feel free to contact us via this contact form. Let LRTK help take your site to the next stage of development.

bottom of page