top of page

What is RTK-GNSS positioning that is attracting attention now?

タイマーアイコン.jpeg
This article takes an average of 2 minutes and 30 seconds to read
Published June 24, 2022
DSC03177.jpg

"Satellite positioning system" used in car navigation systems and map applications.

Among them, "RTK positioning", which can measure position information with higher accuracy, is attracting attention.
So, in this article, what is RTK-GNSS? And I would like to explain the actual RTK positioning.

What is GPS


GPS stands for "Global Positioning System" and is a satellite positioning system developed by the United States.
As mentioned at the beginning, it is used to acquire location information for smartphones and car navigation systems, and has become a familiar part of our lives.

LRTKで現場の測量精度・作業効率を飛躍的に向上

LRTKシリーズは、建設・土木・測量分野における高精度なGNSS測位を実現し、作業時間短縮や生産性の大幅な向上を可能にします。国土交通省が推進するi-Constructionにも対応しており、建設業界のデジタル化促進に最適なソリューションです。

LRTKの詳細については、下記のリンクよりご覧ください。

 

製品に関するご質問やお見積り、導入検討に関するご相談は、

こちらのお問い合わせフォームよりお気軽にご連絡ください。ぜひLRTKで、貴社の現場を次のステージへと進化させましょう。

bottom of page